Application – August 2025
Volume 1 – Written Statement
- Chapter 1 Introduction
- Chapter 2 Site Description
- Chapter 3 Description of the Proposed Development
- Chapter 4 Forestry
- Chapter 5 Landscape and Visual Appraisal
- Chapter 6 Ecology
- Chapter 7 Ornithology
- Chapter 8 Cultural Heritage DBA
- Chapter 9 Geology and Peat
- Chapter 10 Hydrology and Hydrogeology
- Chapter 11 Noise
- Chapter 12 Transport Statement and CTMP
- Chapter 13 Socio-Economics
- Chapter 14 Outline Battery Safety Management Plan
Volume 2 – Figures and Visualisations
- Figure 2.1 Site Boundary
- Figure 2.2 Site Location
- Figure 4.1 Forestry Location
- Figure 4.2 Forestry Baseline
- Figure 4.3 Forestry Felling
- Figure 6.1 Final Site Layout
- Figure 6.2 Protected Species Survey Results
- Figure 6.3 UK Habitat Survey Results
- Figure 6.4 BNG Baseline Areas and Proposed Infrastructure
- Figure 6.5 NVC Survey Results
- Figure 7.1 Statutory Designated Sites
- Figure 7.2 Snipe Territories
- Figure 7.3 Raptors
- Figure 7.4 Black Grouse records
- Figure 7.5 2025 Survey Results
- Figure 8.1 Heritage Assets within the Study Area
- Figure 10.1 Hydrological Site Walkover Survey
- Figure 10.2 Private Water Supply and Discharges
- Figure 11.1 Noise Monitoring and Assessment Locations
- Figure 11.2 Noise Contour Plot Scenario 1
Volume 3 – Appendices
- Appendix 4.1 Photographic Records
- Appendix 4.2 Tree Survey
- Appendix 5.2_LVA Figures
- Appendix 5.3 Viewpoints_Part 1 of 3
- Appendix 5.3 Viewpoints_Part 2 of 3
- Appendix 5.3 Viewpoints_Part 3 of 3
- Appendix 6.1 Protected Species and UK Habitat Survey Report
- Appendix 6.2 Protected Species Survey Access Splay
- Appendix 6.3 NVC Survey Report
- Appendix 6.4 Biodiversity Net Gain Report
- Appendix 6.5 Outline Habitat Management Plan
- Appendix 8.1 Archaeological Desk-Based Assessment
- Appendix 9.1 Peat Survey Results
- Appendix 9.2 Peat Management Plan
- Appendix 9.3 Peat Landslide and Hazard Risk Assessment Figures
- Appendix 10.1 Hydrological Site Walkover Photographic Record
- Appendix 10.2 Hydrological and Hydrogeological CSM Schematic
- Appendix 10.3 Drainage Impact Assessment
- Appendix 11.1 Noise Impact Assessment Consultation with Highland Council
- Appendix 11.2 Frequency Analysis
Planning Application Drawings
- Location Plan
- Location Plan_Aerial
- Proposed Access Track Cross Section Detail
- Proposed Site Entrance Improvement Works
- Site Plan
- Visibility Splay
- Indicative 33 kV Cable Section
- Indicative BESS and PCS Foundations Plan and Sections
- Indicative BESS Container Details
- Indicative BESS Platform Earthworks
- Indicative BESS Platform Layout
- Indicative Control Room Plan and Elevations
- Indicative Culvert Detail
- Indicative Lighting and CCTV Column Details
- Indicative Palisade Security Fence Detail
- Indicative Power Conversion System Details
Community Consultation
Community Consultation – May 2025
- Welcome
- Proposed Development
- Environmental Surveys
- Environmental Report
- Local Community
- Next Steps
- Visibility Splay off A832
- Proposed RLB Extension
Community Consultation – April 2025